Home > News > Content

Contact Information

Add: West of Yinda Road, North of Gongye 3RD Street, Weicheng Economic Development Zone, Weifang City, Shandong Province
Tel: +86-536-8375505
Mob: +86-186-6066-0902
Fax: +86-536-8985507
E-mail: yilicast@yilicasting.com

Stainless Steel 304 Parts Made by Investment Casting
Sep 26, 2017

Stainless Steel 304 Parts Made by Investment Casting Basic Info

  • Model NO.: casting part

  • Casting Form Material: Metal

  • Casting Form Usage Count: Permanent

  • Stainless Steel Casting Parts Surface Roughness: Ra0.2

  • Machining Tolerance: +/-0.15mm

  • Certification: SGS, CE, RoHS, ISO 9001:2000

  • Surface Condition: Sand Blasting

  • Trade Mark: at OEM ODM

  • Stainless Steel Casting Parts Shipping Port: Qingdao

  • Specification: CE SGS ISO

  • HS Code: 84485900

  • Casting Method: Sand Casting

  • Casting Metal: Nonferrous Alloys

  • Surface Treatment: Polishing

  • Stainless Steel Casting Parts Coating: Water

  • Standard: AISI

  • Package: Within Wooden Crate

  • Original: China

  • Production Capability: 30,000 PCS / Month

  • Origin: China

Stainless Steel 304 Parts Made by Investment Casting Product Description

A&T Industry is a contract manufacture and exporter of high quality  forging parts,machining part,casting part,stamping part with more than 13 years experience.

Place of Origin:

Shandong, China (Mainland)

Brand Name:

AT

Model Number:

Casting parts

Application:

automobile, tractor, mining machinery

Material:

Steel

Dimensions:

Customize

Name:

Casting Parts

Property:

Precise,Durability

Delivery time:

15 days

Service:

OEM & ODM

Size:

Customized

Port of loading:

Qingdao

Place of origin:

China

Produce ability:

1000 metric ton per month

Payment term:

30% deposit, 70% L/C

Transportation:

Land carriage, sea, air





 


customized acceptable when get drawing or sample..
 

Stainless Steel 304 Parts Made by Investment Casting Assurance,

 100% quality manufacturing.
 We guarantee that our products meet your supplied specifications
 Extremely competitive pricing
 Delivery to your port or front door
 4 ---- 8 week lead times
 We handle all paperwork
 Partial container orders
 Flexible payment options
 Unique tooling options
 Full range of packaging options from bulk to retail ready
 Complete testing services available


FAQs

1. Where is your location?

We are located in Qingdao City of China and are closed to Airport. It takes 30minuts by car from Liuting Airport our company.

2. How long has the company been established?

AT INDUSTRY was established in 2009. There is 6 years exporting experiences.

3. How many employees do you have?

Administration / sales    4
Engineering / design as our partner     8
Production as our partners 120
Quality assurance / inspection   10

4. Which countries do you export to?

U.S.A, Germany, France, Italy, UK, Brazil, Middle east of Asia, Thailand, 

5. What proportion of your goods are exported?

100% of our production are exported to all over the world.

6. How long does it take to receive samples?

a) Pattern:30-45days after order 
b) Sample:30days after pattern finishing.
c) The lead time is the general production period and does not include the transportation time.

7. New product development process

Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. to ensure the developing schedule---Design pattern, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the sample with initial inspection report.

8. How long is the manufacturing lead time?

Mass Production: 90days after sample approval by yours.
The lead time is the general production period including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

9. What basis can we buy goods?

We generally offer customers prices FOB& CIF (Carriage, Insurance & Freight). The CIF includes the freight cost to your nominated sea port.
We do provide clearance of goods which needs to be handled by a local freight forwarder.
All local costs and taxes are the responsibility of the buyer. We are happy to offer advisement on shipping if required. 

10. What are the payment terms?

Payment terms are negotiable and will improve for long term customers.
During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.
Production orders can be negotiable. We prefer 50% deposit and the balance by T/T before sails. But sometimes T/T 30 days after sails would also acceptable. 

11. Which currency can we buy in?

We can deal in USD / Euro currency / GBP.

12. How long does it take to ship goods from China by sea?

It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks. It takes about 2 weeks to east coast and 3 weeks to west coast US ports. All sea goods are shipped from Qingdao Port. 

13. How long does it take to ship goods from China by air?

It takes about 7 days to all major destinations. 


Stainless Steel 304 Parts Made by Investment Casting.jpg